DAHSHAN LABS — AI PILOT BRIEF Template version: 2026-10-20 Guide: https://dahshanlabs.com/guides/business-ai-assistant#pilot-resources Arabic version: https://dahshanlabs.com/resources/ai-pilot-brief.ar.txt Copy and complete this template for your project. Blank fields are intentional. This is a planning resource, not a customer case study, quote or delivery commitment. Use redacted examples. Keep credentials and confidential records out of public copies and contact forms; agree a secure route before sharing project data. 1. ONE WORKFLOW Project / organization: Business owner / technical owner: Users and roles: Task to improve: Current steps and tools: One knowledge source: One system to connect: Explicitly out of scope: 2. BASELINE AND BUSINESS HYPOTHESIS Current task volume and observation period: Baseline sample size and how cases were selected: Median / p95 completion time, including review and correction: Error definition and observed errors / total cases: Proposed improvement and how it will be measured: Costs included in the comparison: Baseline evidence location and owner: Keep the baseline and pilot task mix comparable. Record denominators, exclusions and limitations. A hypothetical target is not a measured result. 3. DATA, IDENTITY AND ACTIONS Approved source IDs, revisions and freshness rules: Data owner and permitted use: Roles allowed to read each source / record: Identity provider and tenant boundary: Required languages, terminology and dialects (if any): Read-only operations: Proposed write operation (if required): Who may approve the exact proposed change: Denied operations and escalation route: Model, retrieval, connector and log hosting / data locations: External data recipients and retention / deletion requirements: Sandbox access and credential owner (do not put the credential here): 4. EVALUATION BEFORE DEVELOPMENT Evaluation owner and reviewers for Arabic / English: Test-set version, source revisions and cases per language: Holdout set kept separate from tuning: Supported-answer and citation criteria: Expected handling of missing, stale and conflicting evidence: Denied-access, prompt-injection and approval-bypass tests: Retry, duplicate-write and changed-record tests: Quality thresholds by language, with numerators / denominators: Critical failures that stop rollout: Latency / cost limits and how they are measured: Required operational evidence: Decision rules agreed on (date / approvers): Worksheet: https://dahshanlabs.com/resources/ai-pilot-evaluation.json Replace example scenarios with your approved fixtures. Its measurement fields are empty; record results only after running and reviewing the actual system. 5. DELIVERY AND OPERATIONS Reviewed data-flow design: Sandbox connector and access checks: Review interface and audit / receipt requirements: Evaluation report, remaining failures and test artifacts: Source-code, component-license and deployment ownership: Training, runbook and support responsibilities: Monitoring, incident owner, rollback and disable procedure: Milestones and budget to agree: Production access remains a separate decision after the evidence is reviewed. 6. DECISION RECORD — COMPLETE AFTER THE PILOT Run dates and system / model / configuration versions: Results by language and scenario, including failed / excluded cases: Comparison with the documented baseline: Reviewer and review date: Decision: [ ] proceed [ ] revise [ ] stop Reasons, unresolved risks, owner and next review: 7. OPTIONAL PUBLIC CASE STUDY — SEPARATE PERMISSION Customer approved for public naming: Problem and delivered scope that can be published: Measured outcome, observation period and sample size: Evidence owner and method: Limitations and attribution: Approved quote / logo (only if separately authorized): Written publication approval and date: Do not fill these fields with projected benefits, invented customers or demo results. Prepared by Dahshan Labs, Riyadh, Saudi Arabia. Discuss a redacted brief: https://dahshanlabs.com/contact